Fig. 4From: Impact of flexible bioenergy provision on residual load fluctuation: a case study for the TransnetBW transmission system in 2022Residual load duration curves (RLDC) for the TransnetBW grid network with flexible and non-flexible bioenergy (2022 installed capacities, 2-year reference period)Back to article page