From: A case study of a procedure to optimize the renewable energy coverage in isolated systems: an astronomical center in the North of Chile
Total
1,400,000 e
Transf. 10 MVA 20–66 kV
CSP plant
300,000 e
Transf. 10 MVA 66–23 kV
Paranal
10-km cable line
PV -Paranal
800,000 e
t 1, t 2, t 3
N/A, N/A, 2%