Skip to main content

Table 10 Electrical infrastructures required for the CSP plant

From: A case study of a procedure to optimize the renewable energy coverage in isolated systems: an astronomical center in the North of Chile

Total   1,400,000 e
 Transf. 10 MVA 20–66 kV CSP plant 300,000 e
 Transf. 10 MVA 66–23 kV Paranal 300,000 e
 10-km cable line PV -Paranal 800,000 e
t 1, t 2, t 3 N/A, N/A, 2%