Skip to main content

Table 2 The total cost after 25 years normalized to year 0 for the non-renewable energy systems

From: A case study of a procedure to optimize the renewable energy coverage in isolated systems: an astronomical center in the North of Chile

  CAPEX M e OPEX M e Total M e
Grid 11 100–112 111–123
CCGT 8.5 84.2–109.5 92.7–120