From: A case study of a procedure to optimize the renewable energy coverage in isolated systems: an astronomical center in the North of Chile
Total
3,460,000 e
Transf. 24 MVA 20–66 kV
PV
800,000 e
Transf. 18 MVA 6–66 kV
PHES
600,000 e
Transf. 10 MVA 66–23 kV
Paranal
300,000 e
10-km cable line
PV-Paranal
12-km cable line
PHES-Paranal
960,000 e