From: Scenario-based stochastic optimal operation of wind/PV/FC/CHP/boiler/tidal/energy storage system considering DR programs and uncertainties
Rated speed
2.4(m/s)
Cut-in speed
0.7(m/s)
Cut-out speed
4.2(m/s)
Power coefficient
0.47
Cross-sectional area
3.006(m2)