Table 2 Prediction of GHI evolution during 2020–2030 (main results)

From: Deep learning-based estimation of PV power plant potential under climate change: a case study of El Akarit, Tunisia

T/KT
Case a
1% (18 kWh/m2)
Case b
4% (78 kWh/m2)
Case c
3% (52 kWh/m2)
Case d
12% (12 kWh/m2)
Case e
11% (197 kWh/m2)
Case f
10% (186 kWh/m2)
Case g
9% (158 kWh/m2)
Case h
11% (194 kWh/m2)
Case i
11% (11 kWh/m2)