Fig. 4From: Transitioning to a sustainable development framework for bioenergy in Malaysia: policy suggestions to catalyse the utilisation of palm oil mill residuesRenewable energy development phase in Malaysia and proposed policy intervention to accelerate bioenergy share in the power mix. A (white box) = Allocated (or targeted) installed capacity, The targeted installed capacity for biomass cofiring is as projected by the authors, while for large scale biomass power plant, it is estimated based on the average of power generation potential of biomass described in Table 6. C (blue box) = Commissioned power plants ‘installed capacityBack to article page