No. | Criterion | Value | Source |
---|---|---|---|
1 | Minimum installed electrical equivalent capacity (Pinst) of each BP in a cluster | ≥ 375 kW | |
2 | Distance of all BPs to natural gas grid | ≤ 10 km | [27] |
3 | Distance of BPs to a potential biogas upgrading facility (feed-in point) within a cluster | ≤ 10 km | [27] |
4 | Sum of Pinst of all BP within the cluster | ≥ 5 MW | [29] |