Skip to main content

Table 7 Irrigation operating schedule for the banana plantation

From: Designing a solar and wind hybrid system for small-scale irrigation: a case study for Kalangala district in Uganda

Sr. no

Section no.

Discharge L.P.H

Peak operation time (h)

Area covered (Ac)

Total volume of water required (L)

1

1

3373

5

0.5

16,865

2

2

3373

5

0.5

16,865

Total

  

10

1.0

33,730