Year | Installed capacity | Remuneration in €-ct/kWh | |||||||
---|---|---|---|---|---|---|---|---|---|
Basic | RR1 | M2 | Basic | ER4 | FC I5 | Basic | OW7 | ||
Panel A: EEG I from March 29, 2000 to July 31, 2004 | |||||||||
2000 to 2002 | Up to 500 kWel | 10.10 | 2000 to 2002 | Up to 500 kWel | 10.10 | 2000 to 2002 | Up to 500 kWel | 10.10 | 2000 to 2002 |
Up to 5 mWel | 9.10 | Up to 5 mWel | 9.10 | Up to 5 mWel | 9.10 | ||||
Above 5 mWel | 8.60 | Above 5 mWel | 8.60 | Above 5 mWel | 8.60 | ||||
2003 | Up to 500 kWel | 10.00 | 2003 | Up to 500 kWel | 10.00 | 2003 | Up to 500 kWel | 10.00 | 2003 |
Up to 5 mWel | 9.00 | Up to 5 mWel | 9.00 | Up to 5 mWel | 9.00 | ||||
Above 5 mWel | 8.50 | Above 5 mWel | 8.50 | Above 5 mWel | 8.50 | ||||
2004 | Up to 500 kWel | 9.90 | 2004 | Up to 500 kWel | 9.90 | 2004 | Up to 500 kWel | 9.90 | 2004 |
Up to 5 mWel | 8.90 | Up to 5 mWel | 8.90 | Up to 5 mWel | 8.90 | ||||
Above 5 mWel | 8.40 | Above 5 mWel | 8.40 | Above 5 mWel | 8.40 | ||||
Panel B: EEG II from August 1, 2004 to December 31, 2008 with annual basic remuneration degression: 1.5% | |||||||||
2004 to 2008 | Up to 150 kWel | 11.5 | 2004 to 2008 | Up to 150 kWel | 11.5 | 2004 to 2008 | Up to 150 kWel | 11.5 | 2004 to 2008 |
Up to 500 kWel | 9.90 | Up to 500 kWel | 9.90 | Up to 500 kWel | 9.90 | ||||
Up to 5 mWel | 8.90 | Up to 5 mWel | 8.90 | Up to 5 mWel | 8.90 | ||||
Up to 20 mWel | 8.40 | Up to 20 mWel | 8.40 | Up to 20 mWel | 8.40 | ||||
Panel C: EEG III from January 1, 2009 to December 31, 2011 with annual basic remuneration degression: 1.0% | |||||||||
2009 to 2011 | Up to 150 kWel | 11.55 | 2009 to 2011 | Up to 150 kWel | 11.55 | 2009 to 2011 | Up to 150 kWel | 11.55 | 2009 to 2011 |
Up to 500 kWel | 9.90 | Up to 500 kWel | 9.90 | Up to 500 kWel | 9.90 | ||||
Up to 5 mWel | 8.17 | Up to 5 mWel | 8.17 | Up to 5 mWel | 8.17 | ||||
Up to 20 mWel | 7.71 | Up to 20 mWel | 7.71 | Up to 20 mWel | 7.71 | ||||
Panel D: EEG IV from January 1, 2012 to July 31, 2014 with annual basic remuneration degression: 2.0% | |||||||||
2012 to 2014 | Up to 75 kWel.8 | 25.00 | 2012 to 2014 | Up to 75 kWel.8 | 25.00 | 2012 to 2014 | Up to 75 kWel.8 | 25.00 | 2012 to 2014 |
Up to 150 kWel | 14.30 | Up to 150 kWel | 14.30 | Up to 150 kWel | 14.30 | ||||
Up to 500 kWel | 12.30 | Up to 500 kWel | 12.30 | Up to 500 kWel | 12.30 | ||||
Up to 5 mWel | 11.00 | Up to 5 mWel | 11.00 | Up to 5 mWel | 11.00 | ||||
Up to 20 mWel | 6.00 | Up to 20 mWel | 6.00 | Up to 20 mWel | 6.00 |