Table 8 Percentage distribution of capital cost for proposed 10 kW

From: Techno-economic analysis for the role of single end energy user in mitigating GHG emission

Initial cost

Feasibility study

1.3%

Engineering

4.9%

Power system

67.1%

Inverter and miscellaneous

26.7%

Total

100%