Skip to main content

Table 3 Communalities of thermal power and hydropower

From: Energy efficiency in China: optimization and comparison between hydropower and thermal power

Variable Initial Extraction
Thermal power
 Generation capacity 1.000 0.729
 CO2 1.000 0.945
 Hours 1.000 0.870
 Labor 1.000 0.708
 Energy 1.000 0.947
 Installed capacity 1.000 0.939
Hydropower
 Generation capacity 1.000 0.980
 Hours 1.000 0.739
 Labor 1.000 0.879
 Energy 1.000 0.976
 Install capacity 1.000 0.983
  1. The data are from the authors’ collection