Skip to main content

Table 8 The differences between the categories of the governorate in which the employee lives with respect to installation cost of solar energy systems

From: Solar energy implementation at the household level: Gaza Strip case study

 

North V = 2.932

Gaza V = 3.436

Central V = 3.458

Khanyounes V = 4.178

Rafah V = 3.267

North V = 2.932

-

0.503

0.526

1.245

0.334

Gaza V = 3.436

− 0.503

-

0.023

0.742

−0.169

Central V = 3.458

− 0.526

− 0.023

-

0.719

0.192

Khanyounes V = 4.178

− 1.245

− 0.742

− 0.719

-

−0.911

Rafah V =3.267

− 0.334

0.169

0.192

0.911

0.192