Skip to main content

Table 3 Optimal energy supply systems of scenarios 1 to 4

From: Seawater desalination in micro grids: an integrated planning approach

 

Wind

Battery

Diesel

Invest. (El)

Invest. (Des)

LCoEprim-load

LCoW

 

(kW)

(kWh)

(L)

(USD)

(USD)

(USD/kWh)

(USD/m3)

Current system

-

-

335,700

-

-

0.52

-

Scenario 1

450

432

68,200

1,422,400

-

0.31

-

Scenario 2

450

432

68,200

1,422,400

550,000

0.31

2.32

Scenario 3

450

432

97,700

1,422,400

550,000

0.36

1.91

Scenario 4

450

576

127,400

1,508,200

550,000

0.43

1.91

  1. Invest., initial investment costs. El., Electricity supply system. Des., Dealination unit.