From: Design of local roadway infrastructure to service sustainable energy facilities
Design | Alternative 1 | Alternative 2 | Alternative 3 | Alternative 4 |
---|---|---|---|---|
Jay County, POET Plant, capacity 65 MLY | Â | Â | Â | Â |
 Surface layer (cm) | 7.62 | 8.89 | 10.16 | 10.16 |
 Base layer (cm) | 26.67 | 15.24 | 30.48 | 19.05 |
 Sub-base layer (cm) | 34.29 | 40.64 | 15.24 | 30.48 |
 Pavement cost ($) | 246,744 | 247,468 | 262,624 | 259,417 |
Posey County, Abengoa Bioenergy Plant, capacity 88 MLY | Â | Â | Â | Â |
 Surface layer (cm) | 7.62 | 8.89 | 11.43 | 10.16 |
 Base layer (cm) | 26.67 | 15.24 | 30.48 | 21.59 |
 Sub-base layer (cm) | 35.56 | 44.45 | 15.24 | 30.48 |
 Pavement cost ($) | 249,060 | 254,417 | 282,769 | 266,306 |
Wabash County, POET Plant, capacity 65 MLY | Â | Â | Â | Â |
 Surface layer (cm) | 7.62 | 8.89 | 12.7 | 10.16 |
 Base layer (cm) | 29.21 | 15.24 | 30.48 | 25.4 |
 Sub-base layer (cm) | 38.1 | 49.53 | 15.24 | 30.48 |
 Pavement cost ($) | 260,082 | 263,182 | 302,414 | 276,160 |