Table 12 Ethanol and biomass worksheet results

From: Design of local roadway infrastructure to service sustainable energy facilities

Design Alternative 1 Alternative 2 Alternative 3 Alternative 4
Jay County, POET Plant, capacity 65 MLY     
 Surface layer (cm) 7.62 8.89 10.16 10.16
 Base layer (cm) 26.67 15.24 30.48 19.05
 Sub-base layer (cm) 34.29 40.64 15.24 30.48
 Pavement cost ($) 246,744 247,468 262,624 259,417
Posey County, Abengoa Bioenergy Plant, capacity 88 MLY     
 Surface layer (cm) 7.62 8.89 11.43 10.16
 Base layer (cm) 26.67 15.24 30.48 21.59
 Sub-base layer (cm) 35.56 44.45 15.24 30.48
 Pavement cost ($) 249,060 254,417 282,769 266,306
Wabash County, POET Plant, capacity 65 MLY     
 Surface layer (cm) 7.62 8.89 12.7 10.16
 Base layer (cm) 29.21 15.24 30.48 25.4
 Sub-base layer (cm) 38.1 49.53 15.24 30.48
 Pavement cost ($) 260,082 263,182 302,414 276,160