Skip to main content

Table 5 Resulting actions for glossary-internal terminology standardization (full form terms)

From: Smart grid terminology development—crossing the boundaries of terminology standardization

Term-based entry group Action #1 Action #2 Action #3 Action #4a
Abrechnungszeitraum [Meter]    x x
Letztverbraucher [SmartHomes] x    
Stichtag [OMS-Group]   x   
Zusatzeinrichtung [Meter]    x x
  1. aWhether condition 4 can apply to a term-based entry group can easily be detected automatically, whether condition 4 does apply needs to be analyzed manually.