Input parameters | Target A | Target B | Target C |
---|---|---|---|
Spatial target for ground-mounted PV (%) | 0.33% until 2040 | 0.31% until 2030 | 0.24% until 2028 |
Regional area (km2) | 6.842 km2 | ||
Reference facilities for wind energy | |||
Capacity per area (MWp) | 99.9 |
GIS-Model input | Example scenario ‘Ground-mounted PV in bird priority zones’ | ||
---|---|---|---|
Threshold parameter (%) | 10% (area for ground-mounted PV in bird priority zones) | ||
Area bird priority zones (km2) | 426.14 km2 for red kite top 5 areas | ||
Area for ground-mounted PV (informal analysis [109]) (%) | 0.56% | ||
Scenario results | |||
Area for ground-mounted PV in the scenario (%) | 0.43% | ||
Reached power capacity (MW) | 2.926 MWp | ||
Saldo (spatial targets – area in the scenario) (%) | 0.10% ( +) | 0.13% ( +) | 0.19% ( +) |