Table 4 Electricity purchase price from hydropower plants that utilize power from water streams/waterfalls, PR No. 112/2022

From: Over a century of small hydropower projects in Indonesia: a historical review

No.

Capacity

Highest benchmark price (US cents/kWh)

Years 1–10

Years 11–30

1

up to 1 MW

11.23 × F

7.02

2

 > 1 MW up to 3 MW

10.92 × F

6.82

3

 > 3 MW up to 5 MW

9.65 × F

6.03

4

 > 5 MW up to 20 MW

9.09 × F

5.68

5

 > 20 MW up to 50 MW

8.86 × F

5.54

6

 > 50 MW up to 100 MW

7.81 × F

4.88

7

 > 100 MW

6.74 × F

4.21